- Joined
- Feb 17, 2019
- Messages
- 158
- Reactions
- 170
Point covered well.
Interesting they chose waterway for the pipeline. Reduced costs since not clearing jungle?
Interesting.Thomas, not really a waterway. Many of the ROW are flooded as it rains so much. This location was very remote, only way in was by helicopter.
I flew several missions over a two week period and due to the confidentiality in my contract I'm just now able to share some of the footage. I will post more soon.The Amazon is always interesting, and this clip is also. I wish it was longer
Interesting, but what do you expect to see from that altitude and speed?
This video was to show condition of ROW and to provide investors an idea of the assets. The pipeline in the video was about 40 miles long. The majority of my footage was of facilities not long haul pipelines. Most of my work was on the ground inspecting assets and integrity plans.Interesting, but what do you expect to see from that altitude and speed?