Hidden in rural countryside...The United Utilities Sewage Treatment Works on the outskirts of Preston treats over 14,000 cubic metres of water a day, but is designed to treat over 53,000 cubic metres.
The waste water is screened with grit and settlement removed, and the treated water discharged into the River Ribble after being disinfected with UV light. All the remaining sludge is taken by tanker to a second facility in Blackburn.
Paul.
The waste water is screened with grit and settlement removed, and the treated water discharged into the River Ribble after being disinfected with UV light. All the remaining sludge is taken by tanker to a second facility in Blackburn.
Paul.