I am in the process of applying for my first Airspace Authorization. I have a job offer that is located within the 0-grid of a Class D airport. I had asked elsewhere about this process and possible bad weather on the planned day of flight, and I was told by several folks to request a range of time, not just a single day. I am also referring to a sample AA application found online, and that too shows a range of time, not just a single day.
However, as I work through the actual application this evening, I have entered all the applicable details and I am unable to proceed past the Operational Parameters page. The form is telling me that the Date of Operation must only be a single day for LAANC enabled airports. This conflicts with the other info I have been given and seen from other sources. What am I missing?
However, as I work through the actual application this evening, I have entered all the applicable details and I am unable to proceed past the Operational Parameters page. The form is telling me that the Date of Operation must only be a single day for LAANC enabled airports. This conflicts with the other info I have been given and seen from other sources. What am I missing?