- Joined
- Jan 31, 2019
- Messages
- 640
- Reactions
- 1,462
Here is a cool video for you all. We were able to film a heavy lift vessel come into Prince Rupert to transfer two hydroelectric turbines for the Site C Dam project. Over to a waiting heavy lift barge. From there they will be loaded onto a special truck and transported to the site
https://youtu.be/60csmOLz2ZU
https://youtu.be/60csmOLz2ZU