Let's get this out there in one neat and tidy package for future reference. This is only relevant for Part 107 Operations under the FAA in the United States of America!!
This is from April 2021 so the actual dates might have changed a few days here or there but they are very close. At this point it's irrelevant!!
Ops over People (OOP):
There are 4 categories of OOP.
Ops over People, Category 1:
The PIC must use an aircraft that:
•Weighs less than 250g (.55 lbs.), and
•Contains no “exposed rotating parts that would lacerate human skin upon impact with a human being”.
•There are no manufacturer requirements for Declaration of Compliance. It will be incumbent upon the PIC to make sure the UAS qualifies.
•No sustained flights over open air assemblies w/o RID (concerts, construction sites, etc.).
•Goes into effect on 4/21/21.
•No flights over open-air assemblies w/o RID.
Ops over People, Category 2:
The PIC must use an aircraft that:
•Possesses a Declaration of Compliance.
•Does not transfer more than 11 ft/lbs of KE.
•Has no rotating parts that lacerate skin.
•Does not contain any safety defects.
•No sustained flights over open air assemblies w/o RID (concerts, construction sites, etc.).
•Labeled as such.
•Maintained records & instructions.
•Implementation date is dependent on when manufacturers can get their Declaration of Compliance approved.
•They can start submitting them 9-12 months after 4/16/21.
Ops over People, Category 3:
The PIC must use an aircraft that:
•Possesses a Declaration of Compliance.
•Does not transfer more than 25 ft/lbs of KE.
•Has no rotating parts that lacerate skin.
•Does not contain any safety defects.
•Labeled as such.
•Maintained records & instructions.
•The PIC may not fly above open air assemblies.
•May only operate over people if:
•On a closed-site with notice given, or
•If person is directly part of the operation, or
•Under shelter or stationary vehicle.
•There is no RID requirement for this category.
•Implementation date is dependent on when manufacturers can get their Declaration of Compliance approved.
•They can start submitting them 9-12 months after 4/16/21.
Ops over People, Category 4:
The PIC must use an aircraft that:
•Possesses a Part 21 Airworthiness Certificate.
•Operated within the Flight Manual.
•Be RID compliant.
•Have very detailed records.
•Have all records accessible by the FAA and/or NTSB.
•Implementation date is dependent on when manufacturers can get their Airworthiness Certificate approved.
•They can start submitting them 6-12 months after 4/16/21.
Ops Over Moving Vehicles:
The PIC must use an aircraft that:
•Qualifies for OOP operations
•Categories 1-3 must:
•Remain in a closed-set with notification, or
•Not maintain sustained flights over vehicles (basically they must be transitory).
•Category 4 must be operated in accordance with their Flight Manual.
•All operations over moving vehicles are tied to the timeline of the category of OOP they fall under.
This is from April 2021 so the actual dates might have changed a few days here or there but they are very close. At this point it's irrelevant!!
Ops over People (OOP):
There are 4 categories of OOP.
Ops over People, Category 1:
The PIC must use an aircraft that:
•Weighs less than 250g (.55 lbs.), and
•Contains no “exposed rotating parts that would lacerate human skin upon impact with a human being”.
•There are no manufacturer requirements for Declaration of Compliance. It will be incumbent upon the PIC to make sure the UAS qualifies.
•No sustained flights over open air assemblies w/o RID (concerts, construction sites, etc.).
•Goes into effect on 4/21/21.
•No flights over open-air assemblies w/o RID.
Ops over People, Category 2:
The PIC must use an aircraft that:
•Possesses a Declaration of Compliance.
•Does not transfer more than 11 ft/lbs of KE.
•Has no rotating parts that lacerate skin.
•Does not contain any safety defects.
•No sustained flights over open air assemblies w/o RID (concerts, construction sites, etc.).
•Labeled as such.
•Maintained records & instructions.
•Implementation date is dependent on when manufacturers can get their Declaration of Compliance approved.
•They can start submitting them 9-12 months after 4/16/21.
Ops over People, Category 3:
The PIC must use an aircraft that:
•Possesses a Declaration of Compliance.
•Does not transfer more than 25 ft/lbs of KE.
•Has no rotating parts that lacerate skin.
•Does not contain any safety defects.
•Labeled as such.
•Maintained records & instructions.
•The PIC may not fly above open air assemblies.
•May only operate over people if:
•On a closed-site with notice given, or
•If person is directly part of the operation, or
•Under shelter or stationary vehicle.
•There is no RID requirement for this category.
•Implementation date is dependent on when manufacturers can get their Declaration of Compliance approved.
•They can start submitting them 9-12 months after 4/16/21.
Ops over People, Category 4:
The PIC must use an aircraft that:
•Possesses a Part 21 Airworthiness Certificate.
•Operated within the Flight Manual.
•Be RID compliant.
•Have very detailed records.
•Have all records accessible by the FAA and/or NTSB.
•Implementation date is dependent on when manufacturers can get their Airworthiness Certificate approved.
•They can start submitting them 6-12 months after 4/16/21.
Ops Over Moving Vehicles:
The PIC must use an aircraft that:
•Qualifies for OOP operations
•Categories 1-3 must:
•Remain in a closed-set with notification, or
•Not maintain sustained flights over vehicles (basically they must be transitory).
•Category 4 must be operated in accordance with their Flight Manual.
•All operations over moving vehicles are tied to the timeline of the category of OOP they fall under.
Last edited: