I need some quick advice and help! I have a big mapping and thermal job coming up. Its made up of several smaller sites on a large parcel, and by my calculations i need 10 batteries to complete the visual with my M2P, then ANOTHER 10 to complete the thermal with my M2EA after sunset. I only have 7 total batteries, but i will have a few hours to charge batteries during and in between flights.
Is there an option out there to charge 4 or more of these batteries simultaneously? I have the SMATree but thats only 2 at a time, and at $150 its not economical to buy 4 of them, Please let me know what you might know of!
Thanks
Mike
Is there an option out there to charge 4 or more of these batteries simultaneously? I have the SMATree but thats only 2 at a time, and at $150 its not economical to buy 4 of them, Please let me know what you might know of!
Thanks
Mike