I accidentally ended up with a video shot in 29.97 fps in a 25 fps timeline. No idea how that happened, but it did. Googling an answer, the general advice seems to be to create a new timeline, deselect "Use Project Settings," and set the new timeline's frame rate to 29.97, and then Copy/Paste the clips into the new timeline. I tried this, but the frame rate is still set to 25 fps when I look at the settings. Any advice?